The dismantling project of the tower crane at the Porto-Brandão terminal required exceptional technical expertise and logistical capabilities. This complexity resulted from the fact that the operation was carried out in an active facility subject to the major accident prevention regime involving hazardous substances.

The work involved the mobilization of lifting equipment, namely mobile cranes with capacities ranging from 100 to 200 tonnes, as well as a skilled technical team capable of carrying out the tasks in accordance with the required safety conditions, complying with all procedures applicable to this type of work.